Plant Cortex

Home / Industries / Pulp & Paper

A web break is a stoppage the plant keeps meeting.

A paper machine is one continuous line from wet end to reel. Breaks, felts, rolls and drives fail in familiar patterns, and the fix often lives in someone's memory.

Start a pilot

The machine breaks the web for the third time this week.

An illustrative night on this kind of floor, and what Plant Cortex does at each point.

  1. The break

    Another break at the dryer section. The crew re-threads, the machine restarts, and the log says "restarted".

  2. The pattern

    Plant Cortex shows that the same note, "restarted", has closed several stoppages on this section, and that nobody has recorded a root cause check.

  3. The question

    The reliability lead asks what the manuals say about this break pattern. The answer is cited and honest about what the manuals do not cover.

  4. What stays

    A corrective work order is created from the stoppage with an owner and a due date, and the 14-day check shows whether the fix held.

Where this floor gets hurt.

Fixes that are really resets

Closing a stoppage with "restarted" fixes nothing. The repeat view flags a machine whose same fix has been applied again and again.

Wet end and dry end

Two ends of one machine, two crews. Handover between them is where context is lost.

Wear parts and consumables

Felts, doctor blades, bearings and chemicals. Reorder points and a movement history instead of a silent stock-out.

Long restarts

A restart checklist ticked at the machine, not remembered, shortens the second attempt.

  • Pulpers and refiners
  • Headbox and forming section
  • Press and dryer sections
  • Felts and rolls
  • Calender and reel
  • Recovery boiler and utilities

The questions this floor asks, and what comes back.

Examples of shape only. The real content comes from your own manuals and drawings.

What are the checks on a press roll bearing after a high temperature alarm?

Comes back withCited checks from the roll or bearing manual, and the earlier stoppages on that roll if they were logged.

Show the lube arrangement for the dryer drive

Comes back withThe matching drawing page, opened from the same chat.

The modules that matter most here.

Repeat offenders

Machines ranked by stoppages, with the same-fix finding and a 14-day "did it hold" check.

Downtime log

Live clock per stoppage, MTBF, MTTR and cost where a human has entered a rate.

Shift log

A written handover with the machines still down frozen into it.

Spares

Reorder points, where-used links across machines, and alternative parts.

Bring the manuals for one pulp & paper unit.

A few real documents, a few weeks, and success criteria agreed up front.

Start a pilot